El proyecto Naos inicio con una llamada telefónica la cual mi persona, Allan Rojas contestó el pasado 09 de diciembre de 2019, la llamada entro a la central de ZEBOL, y conté con la dicha de poder atenderle y ayudarle.
A 78% reduction in the loading time of the boom spray was made, from 36 or 38 minutes to 6 to 8 minutes.
The equipment was operated under different circumstances or eventualities, carrying out all the performance tests of the system and others and everything was excellent.
A reduction in power consumption was realized for the application by going from using a 100 hp compressor to drive 8 pumps to consuming less than 4hp altogether for the 8 recommended pumps.
Currently the system has been in operation for several months and everything has been impeccable, from an installation topic to a technical equipment selection topic.